矿业工程
礦業工程
광업공정
MINING ENGINEERING
2014年
5期
8-10,11
,共4页
付其锐%王淑娟%刘大兵
付其銳%王淑娟%劉大兵
부기예%왕숙연%류대병
F3 断裂带%超前导水%预支护%新技术
F3 斷裂帶%超前導水%預支護%新技術
F3 단렬대%초전도수%예지호%신기술
F3 fault zone%advancing water diversion%pre-support%new technology
针对传统方式通过三山岛金矿 F3断裂带存在的诸多不足,采用超前导水预支护新技术通过 F3断裂带。通过阐述该技术施工方案及过程,并结合实际的应用效果,论证了该新技术通过 F3断裂带的可行性和优势。
針對傳統方式通過三山島金礦 F3斷裂帶存在的諸多不足,採用超前導水預支護新技術通過 F3斷裂帶。通過闡述該技術施工方案及過程,併結閤實際的應用效果,論證瞭該新技術通過 F3斷裂帶的可行性和優勢。
침대전통방식통과삼산도금광 F3단렬대존재적제다불족,채용초전도수예지호신기술통과 F3단렬대。통과천술해기술시공방안급과정,병결합실제적응용효과,론증료해신기술통과 F3단렬대적가행성화우세。
The main construction organization of traditional F3 fault zone has many shortage.The new technology of advancing water diversion pre-support quickly passing through F3 fault zone is adopted.The paper presents the construction scheme and process of this technology.With the combination of the real application effect,the paper discusses the feasibility and advantages to use this technology passing through the F3 fault zone.