基于动力有限元法模拟不同碰撞条件下隧道衬砌与大型车辆的动态相互作用,研究车辆与隧道结构在撞击作用下的动态响应。结果表明:在碰撞角度相同的情况下,隧道衬砌拉伸损伤值随车速的增大而增大;在失控车速相同的条件下,拉伸损伤值随碰撞角度的增大而增大;碰撞速度与角度越大,则车内人员受到的加速度越大,损伤越严重。对我国京沪高速公路上的蟠龙隧道碰撞事故(2009年)进行了数值模拟,对比分析发现数值模拟结果与蟠龙隧道碰撞事故后衬砌的表观信息及超声波探测结果有很好的一致性,碰撞后损伤区域的混凝土渗透系数明显增大,表明碰撞后衬砌发生漏水的几率明显增大。
基于動力有限元法模擬不同踫撞條件下隧道襯砌與大型車輛的動態相互作用,研究車輛與隧道結構在撞擊作用下的動態響應。結果錶明:在踫撞角度相同的情況下,隧道襯砌拉伸損傷值隨車速的增大而增大;在失控車速相同的條件下,拉伸損傷值隨踫撞角度的增大而增大;踫撞速度與角度越大,則車內人員受到的加速度越大,損傷越嚴重。對我國京滬高速公路上的蟠龍隧道踫撞事故(2009年)進行瞭數值模擬,對比分析髮現數值模擬結果與蟠龍隧道踫撞事故後襯砌的錶觀信息及超聲波探測結果有很好的一緻性,踫撞後損傷區域的混凝土滲透繫數明顯增大,錶明踫撞後襯砌髮生漏水的幾率明顯增大。
기우동력유한원법모의불동팽당조건하수도츤체여대형차량적동태상호작용,연구차량여수도결구재당격작용하적동태향응。결과표명:재팽당각도상동적정황하,수도츤체랍신손상치수차속적증대이증대;재실공차속상동적조건하,랍신손상치수팽당각도적증대이증대;팽당속도여각도월대,칙차내인원수도적가속도월대,손상월엄중。대아국경호고속공로상적반룡수도팽당사고(2009년)진행료수치모의,대비분석발현수치모의결과여반룡수도팽당사고후츤체적표관신식급초성파탐측결과유흔호적일치성,팽당후손상구역적혼응토삼투계수명현증대,표명팽당후츤체발생루수적궤솔명현증대。
Based on dynamic finite element method,the dynamic interaction under different crash conditions between the tunnel lining and large vehicle and the dynamic response of them were studied.The results showed that in the same collision angle,the tensile damage value of the tunnel lining increased with the vehicles speeding up,and with the colli-sion angle increasing at the same velocity.In addition,the increasing of the velocity and the angle of crash produced higher acceleration to the passengers,which meant a worse damage.Numerical simulation was carried out for an acci-dent occurred in the Panlong Tunnel on the Jingfu Expressway (2009 ),and the results of the simulation was highly con-sistent with the appearance of the tunnel lining after the accident and the ultrasonic test image.The permeability coeffi-cient of the concrete in the damage areas increased apparently,which led to a higher probability of water leakage for the tunnel lining.