公路工程
公路工程
공로공정
JOURNAL OF HIGHWAY ENGINEERING
2014年
5期
71-74,109
,共5页
饱和黄土%水泥粉煤灰搅拌桩%沉降监测%最终沉降量
飽和黃土%水泥粉煤灰攪拌樁%沉降鑑測%最終沉降量
포화황토%수니분매회교반장%침강감측%최종침강량
saturated loess%fly-ash cement mixing pile%subsidence monitoring%ultimate settle-ment
针对渭蒲高速公路饱和黄土地基用水泥粉煤灰搅拌桩加固路段,采用埋设沉降杯法进行了长期的现场监测。通过分析监测数据,得出了复合地基的沉降量、沉降速率随上部荷载和时间的变化趋势。同时结合实体工程中复合地基的各项参数,对其沉降量进行了理论计算和数值模拟。对比三种复合地基沉降量的分析方法得出:柔性荷载作用下复合地基的理论计算因受桩体刺入下卧层长度、桩侧摩阻力等各种不确定因素的影响,不同理论计算方法的结果差异较大,实际意义不大;现场监测和数值模拟结果具有相似性,但是忽略了实际工程中次固结沉降对饱和黄土地基沉降的影响,故数值分析值偏小;针对饱和黄土的特殊工程性质,可将现场监测的结果与数值分析的规律结合起来,对复合地基的最终沉降进行预测。
針對渭蒲高速公路飽和黃土地基用水泥粉煤灰攪拌樁加固路段,採用埋設沉降杯法進行瞭長期的現場鑑測。通過分析鑑測數據,得齣瞭複閤地基的沉降量、沉降速率隨上部荷載和時間的變化趨勢。同時結閤實體工程中複閤地基的各項參數,對其沉降量進行瞭理論計算和數值模擬。對比三種複閤地基沉降量的分析方法得齣:柔性荷載作用下複閤地基的理論計算因受樁體刺入下臥層長度、樁側摩阻力等各種不確定因素的影響,不同理論計算方法的結果差異較大,實際意義不大;現場鑑測和數值模擬結果具有相似性,但是忽略瞭實際工程中次固結沉降對飽和黃土地基沉降的影響,故數值分析值偏小;針對飽和黃土的特殊工程性質,可將現場鑑測的結果與數值分析的規律結閤起來,對複閤地基的最終沉降進行預測。
침대위포고속공로포화황토지기용수니분매회교반장가고로단,채용매설침강배법진행료장기적현장감측。통과분석감측수거,득출료복합지기적침강량、침강속솔수상부하재화시간적변화추세。동시결합실체공정중복합지기적각항삼수,대기침강량진행료이론계산화수치모의。대비삼충복합지기침강량적분석방법득출:유성하재작용하복합지기적이론계산인수장체자입하와층장도、장측마조력등각충불학정인소적영향,불동이론계산방법적결과차이교대,실제의의불대;현장감측화수치모의결과구유상사성,단시홀략료실제공정중차고결침강대포화황토지기침강적영향,고수치분석치편소;침대포화황토적특수공정성질,가장현장감측적결과여수치분석적규률결합기래,대복합지기적최종침강진행예측。
Aiming at the section which was strengthened by fly-ash cement mixing pile of saturated loess foundation in Weinan-Pucheng expressway,a buried settlement cup method has been adopted in field monitoring.According to the monitoring data such thing like foundation subsidence of composite foundation and the trend of settlement rate with upper load and time has been got.Then theoretical calcu-lation and numerical simulation has been combined to study on the foundation subsidence of composite foundation in entitative engineering with its parameters.The results show that the results was quite differ-ent in upper three theoretical calculation methods,because of it was affected by all kinds of uncertainty factors such as pile length which Piercing the underlying layer and Pile shaft resistance.And its actual significance was not very.The results of field monitoring closer to that of numerical simulation,but the value of numerical simulation was small for something like saturated loess foundation affected by seconda-ry consolidation settlement has been neglected.Based on the special engineering property of saturated lo-ess,the final settlement of composite foundation can be forecasted by which combined with the result of field monitoring and the discipline of numerical simulation.