2014年
20期
104-109
,共6页
道路建筑材料%价格波动%工程量清单%调差方法
道路建築材料%價格波動%工程量清單%調差方法
도로건축재료%개격파동%공정량청단%조차방법
road construction material%price fluctuation%engineering quantity list%adjustment method
由于受市场和政策等因素的影响,各种材料的价格在交通建设项目建设期常常变化很大,其变化幅度是业主和投标人在招投标过程中难以预测的,引起的费用超出了承包商实际承受能力,因此对主要材料价差引起的费用进行适当的调整很有必要。在对材料调差的管理要素和传统方法进行分析的基础上,再结合行业和项目管理的实际情况,给出了依据批复的工程量清单预算来确定全线各支付子目对应材料调差品种的定额消耗平均值,作为各期材料调差数量的计算依据,乘以计量工程量计算调差数量,再根据各种材料的风险幅度确定调差金额的改进方法。
由于受市場和政策等因素的影響,各種材料的價格在交通建設項目建設期常常變化很大,其變化幅度是業主和投標人在招投標過程中難以預測的,引起的費用超齣瞭承包商實際承受能力,因此對主要材料價差引起的費用進行適噹的調整很有必要。在對材料調差的管理要素和傳統方法進行分析的基礎上,再結閤行業和項目管理的實際情況,給齣瞭依據批複的工程量清單預算來確定全線各支付子目對應材料調差品種的定額消耗平均值,作為各期材料調差數量的計算依據,乘以計量工程量計算調差數量,再根據各種材料的風險幅度確定調差金額的改進方法。
유우수시장화정책등인소적영향,각충재료적개격재교통건설항목건설기상상변화흔대,기변화폭도시업주화투표인재초투표과정중난이예측적,인기적비용초출료승포상실제승수능력,인차대주요재료개차인기적비용진행괄당적조정흔유필요。재대재료조차적관리요소화전통방법진행분석적기출상,재결합행업화항목관리적실제정황,급출료의거비복적공정량청단예산래학정전선각지부자목대응재료조차품충적정액소모평균치,작위각기재료조차수량적계산의거,승이계량공정량계산조차수량,재근거각충재료적풍험폭도학정조차금액적개진방법。
Due to the impact of market and policy and other factors, prices of various materials in the con-struction of transportation construction projects often vary widely. It is difficult to predict the magnitude of the change in the bidding process by the owners and bidders, and the costs caused by the price differenc-es exceeds the actual affordability of the contractor, so it is necessary to make appropriate adjustment on the charge caused by the price difference of the main material. The article analyzes the management ele-ments and traditional methods of the materials price adjustment. And combined with the actual situation of the industry and project management, it gives an improved method which based on the approval of BOQ budget to determine the mean value of quota consumption of the main material difference adjustment spe-cies of payment of across the board various subdirectories, as the basis for the accounting each period of materials price adjustment data. It calculates adjustment quantities by multiplying measurement of quanti-ties. Then based on a variety of materials magnitude of the risk, it determines the adjustment cost.