结合瓦村水电站工程地形、地质条件,对上、下坝址及坝型进行综合比选后,推荐下坝址混凝土重力坝方案,枢纽主要建筑物由拦河坝、发电厂房、左岸两级垂直升船机及交通道路等组成。根据工程实际情况,对工程总布置进行设计介绍。
結閤瓦村水電站工程地形、地質條件,對上、下壩阯及壩型進行綜閤比選後,推薦下壩阯混凝土重力壩方案,樞紐主要建築物由攔河壩、髮電廠房、左岸兩級垂直升船機及交通道路等組成。根據工程實際情況,對工程總佈置進行設計介紹。
결합와촌수전참공정지형、지질조건,대상、하패지급패형진행종합비선후,추천하패지혼응토중력패방안,추뉴주요건축물유란하패、발전엄방、좌안량급수직승선궤급교통도로등조성。근거공정실제정황,대공정총포치진행설계개소。
For Wacun Hydropower Project, the construction scheme of concrete gravity main dam at lower dam site was recommended after upper and lower dam sites as well as dam type alternatives were compared combined with topographical and geological conditions. Key structures of this project include water retaining dam, powerhouse, two-level vertical ship lift by left bank and access roads. An introduction was made on the general layout of Project.