水利水电科技进展
水利水電科技進展
수이수전과기진전
ADVANCES IN SCIENCE AND TECHNOLOGY OF WATER RESOURCES
2014年
6期
82-88
,共7页
付冠杰%范明桥%李杰%徐锴%雷国辉
付冠傑%範明橋%李傑%徐鍇%雷國輝
부관걸%범명교%리걸%서개%뢰국휘
同步加固技术%软土地基%堆载预压%吹填淤泥%真空预压
同步加固技術%軟土地基%堆載預壓%吹填淤泥%真空預壓
동보가고기술%연토지기%퇴재예압%취전어니%진공예압
synchronous soil improvement technique%soft ground%surcharge preloading%hydraulic fills%vacuum preloading
针对软土地基上吹填造陆工程中真空预压法加固软土地基和吹填淤泥工期较长、效果较差的问题,提出了堆载吹填淤泥并同步真空预压加固技术,将吹填淤泥加固及软土地基加固两阶段施工整合到一个真空预压周期内完成,大幅度缩短了造陆工期。试验结果表明:该技术有效解决了常规真空预压法中上部吹填淤泥变形过大,影响下部软土地基加固效果的问题,并且充分利用吹填淤泥的自重,无须额外的堆载材料,即可使软土地基处于真空联合堆载预压的加固模式,进一步提高了加固效果。
針對軟土地基上吹填造陸工程中真空預壓法加固軟土地基和吹填淤泥工期較長、效果較差的問題,提齣瞭堆載吹填淤泥併同步真空預壓加固技術,將吹填淤泥加固及軟土地基加固兩階段施工整閤到一箇真空預壓週期內完成,大幅度縮短瞭造陸工期。試驗結果錶明:該技術有效解決瞭常規真空預壓法中上部吹填淤泥變形過大,影響下部軟土地基加固效果的問題,併且充分利用吹填淤泥的自重,無鬚額外的堆載材料,即可使軟土地基處于真空聯閤堆載預壓的加固模式,進一步提高瞭加固效果。
침대연토지기상취전조륙공정중진공예압법가고연토지기화취전어니공기교장、효과교차적문제,제출료퇴재취전어니병동보진공예압가고기술,장취전어니가고급연토지기가고량계단시공정합도일개진공예압주기내완성,대폭도축단료조륙공기。시험결과표명:해기술유효해결료상규진공예압법중상부취전어니변형과대,영향하부연토지기가고효과적문제,병차충분이용취전어니적자중,무수액외적퇴재재료,즉가사연토지기처우진공연합퇴재예압적가고모식,진일보제고료가고효과。
In hydraulic fill reclamation projects, the construction duration is long when the vacuum preloading method is used to improve soft ground and hydraulic fill. However, the effectiveness of improvement is relatively poor. To overcome these problems, a ground treatment technique is proposed for land reclamations with hydraulic fills on soft soils. This technique utilizes the hydraulic fills as a surcharge loading for the soft soils, and then synchronously applies vacuum preloading to both the soft soils and the hydraulic fills. By using this technique, two separate construction phases of improving soft soils and hydraulic fills are merged into a single construction period. Thus, construction time can be greatly shortened. Field test results show that the proposed technique effectively eliminates the influence of excessive deformations of the upper hydraulic fills on the improvement effectiveness of the lower soft soils in the conventional vacuum preloading technique. With no recourse to any other surcharge materials, the soft soils can be improved by vacuum combined surcharge preloading. It further promotes the effectiveness of soil improvement.