Journal of Anhui Institute of Architecture & Industry
2014年
5期
20-22
,共3页
矮塔斜拉桥%主梁受力%最大双悬臂状态%成桥状态
矮塔斜拉橋%主樑受力%最大雙懸臂狀態%成橋狀態
왜탑사랍교%주량수력%최대쌍현비상태%성교상태
Low Tower Cable-stayed Bridge%Analysis of Main Girder Stress%the maximum twin can-tilever%end of construction state
矮塔斜拉桥是介于连续梁桥和普通斜拉桥之间的新型桥梁,其受力以主梁为主,拉索为辅。本文通过有限元软件M IDAS建立全桥模型,对主梁最大双悬臂状态及成桥状态进行受力分析,并获得相关结论,可为同类桥型设计提供参考依据。
矮塔斜拉橋是介于連續樑橋和普通斜拉橋之間的新型橋樑,其受力以主樑為主,拉索為輔。本文通過有限元軟件M IDAS建立全橋模型,對主樑最大雙懸臂狀態及成橋狀態進行受力分析,併穫得相關結論,可為同類橋型設計提供參攷依據。
왜탑사랍교시개우련속량교화보통사랍교지간적신형교량,기수력이주량위주,랍색위보。본문통과유한원연건M IDAS건립전교모형,대주량최대쌍현비상태급성교상태진행수력분석,병획득상관결론,가위동류교형설계제공삼고의거。
Low tower cable-stayed bridge is a new type of hybrid structure between continuous bridge and cable-stayed bridge based in the main girder and cable supplement of the force .Finite element software called Midas/Civil was used to build up calculation model of the bridge ,then focused on ana‐lyzing the structural behavior at the stages as follows :the maximum twin cantilever ,end of construc‐tion state .On the basis of it ,proposes the maximum internal force of construction process shall be the control basis ,and need further analysis of NO .0 block of similar bridge ,in the hope of providing ref‐erence to the similar bridge .