山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2014年
33期
118-119,120
,共3页
管网%供水%水压%模型%方案
管網%供水%水壓%模型%方案
관망%공수%수압%모형%방안
pipe network%water-supply%water pressure%model%scheme
针对高铁建瓯西站建设的相关要求,基于管网水力模型平台,从供水量、供水压力、配水管网的供水能力等角度出发,提出了合理的水厂替代方案,实践表明,应用管网水力模型辅助方案研究,能够给决策者一个较为明确的数据依据,有助于提高供水方案的科学性、合理性以及安全性。
針對高鐵建甌西站建設的相關要求,基于管網水力模型平檯,從供水量、供水壓力、配水管網的供水能力等角度齣髮,提齣瞭閤理的水廠替代方案,實踐錶明,應用管網水力模型輔助方案研究,能夠給決策者一箇較為明確的數據依據,有助于提高供水方案的科學性、閤理性以及安全性。
침대고철건구서참건설적상관요구,기우관망수력모형평태,종공수량、공수압력、배수관망적공수능력등각도출발,제출료합리적수엄체대방안,실천표명,응용관망수력모형보조방안연구,능구급결책자일개교위명학적수거의거,유조우제고공수방안적과학성、합이성이급안전성。
According to related requirements for the construction of the express railway Jian’ou West Station,the paper points out reasonable wa-ter treatment plant displacement scheme from the water supply volume,water-supply pressure,and water-supply capacity of the water-supply pipe network,and proves by the practice that the pipe network hydraulic model auxiliary scheme can provide more accurate data so it is helpful for making the water-supply schemes more scientific,reasonable and secure.