建筑工程%预结算%定额计价%清单计价
建築工程%預結算%定額計價%清單計價
건축공정%예결산%정액계개%청단계개
architectural engineering%pre-settlement%quota%bill of quantities
通过对建筑工程预结算中定额与清单计价方式的介绍,对比分析了两种计价模式的计算方式及优缺点,并研究了定额计价与清单计价不同的应用原则,指出清单计价具有定额计价不可比拟的优势,是今后工程预结算的发展趋势。
通過對建築工程預結算中定額與清單計價方式的介紹,對比分析瞭兩種計價模式的計算方式及優缺點,併研究瞭定額計價與清單計價不同的應用原則,指齣清單計價具有定額計價不可比擬的優勢,是今後工程預結算的髮展趨勢。
통과대건축공정예결산중정액여청단계개방식적개소,대비분석료량충계개모식적계산방식급우결점,병연구료정액계개여청단계개불동적응용원칙,지출청단계개구유정액계개불가비의적우세,시금후공정예결산적발전추세。
According to the introduction of the quota and bill of quantities in the architectural engineering pre-settlement,the paper compares and analyzes the calculation approaches and their advantages and disadvantages of the two calculation modes,and researches various application prin-ciples for the quota and bill of quantities,and points out the latter one has the invincible edge,so it will be the trend for the following engineering pre-settlement.