钢管嵌岩桩%斜桩成孔%施工工艺%施工机械%问题及对策
鋼管嵌巖樁%斜樁成孔%施工工藝%施工機械%問題及對策
강관감암장%사장성공%시공공예%시공궤계%문제급대책
rock-socketed steel-pipe pile%raking pile pore-forming%construction technology%construc-tion machinery%problems and countermeasures
通过湄洲湾内某30万t级原油码头的工程实践,介绍了在孤岛作业、复杂地质条件环境下高桩墩式结构斜桩嵌岩成孔的施工工艺,并对施工过程中存在的问题进行了分析。
通過湄洲灣內某30萬t級原油碼頭的工程實踐,介紹瞭在孤島作業、複雜地質條件環境下高樁墩式結構斜樁嵌巖成孔的施工工藝,併對施工過程中存在的問題進行瞭分析。
통과미주만내모30만t급원유마두적공정실천,개소료재고도작업、복잡지질조건배경하고장돈식결구사장감암성공적시공공예,병대시공과정중존재적문제진행료분석。
Meizhou Bay 300 000 DWT crude oil terminal project is based on to introduce the pore-forming technology of rock-socketed raking pile for high pile pier foundation under the conditions of complex geology and island operation. The problems occurred in the construction is also analyzed.