介绍了300 MW机组无启动汽源冷态启动存在问题,在机组启动过程中通过对汽包壁温差和锅炉侧疏水流量、锅炉燃烧和汽温汽压、尾部烟道再燃烧等关键参数的控制,避免了机组无启动汽源启动时容易出现的各类问题,保证了机组的顺利启动。
介紹瞭300 MW機組無啟動汽源冷態啟動存在問題,在機組啟動過程中通過對汽包壁溫差和鍋爐側疏水流量、鍋爐燃燒和汽溫汽壓、尾部煙道再燃燒等關鍵參數的控製,避免瞭機組無啟動汽源啟動時容易齣現的各類問題,保證瞭機組的順利啟動。
개소료300 MW궤조무계동기원랭태계동존재문제,재궤조계동과정중통과대기포벽온차화과로측소수류량、과로연소화기온기압、미부연도재연소등관건삼수적공제,피면료궤조무계동기원계동시용역출현적각류문제,보증료궤조적순리계동。
The dangerous points of cold state start-up of a 300 MW unit without start-up steam were intro-duced.Through control of the key parameters (such as the drum wall temperature difference,drainage flow at the boiler side,steam temperature and pressure and reburning of the flue gas in tail duct)during the unit start-up,the problems easily occurred during the unit start-up with no start-up steam can be avoided,which ensures successful start-up of the unit.