针对2011年发生的大规模风电机组脱网事故及2012年以来出现的严重弃风现象,结合大型工程一般发展规律,以酒泉风电基地为实例,通过分析其建设运行过程中的各种现象及暴露出的问题,探讨提出大型风电基地整体发展的几个特点。大型风电基地开发是一项工程活动,必须遵循工程固有自然科学规律。大规模风电开发是复杂的技术和技术群的应用和集成,要按工程科学实施。大规模风电开发是目标要求明确的大型工程,成本、质量、效率必须三者并重。大规模风电受地理、当地经济和电网等多因素制约,应由国家能源主管部门进行规划、建设、运行和用电的整体协调。为了保证大型风电基地的可持续发展,其必须要与环境、生态协调一致。
針對2011年髮生的大規模風電機組脫網事故及2012年以來齣現的嚴重棄風現象,結閤大型工程一般髮展規律,以酒泉風電基地為實例,通過分析其建設運行過程中的各種現象及暴露齣的問題,探討提齣大型風電基地整體髮展的幾箇特點。大型風電基地開髮是一項工程活動,必鬚遵循工程固有自然科學規律。大規模風電開髮是複雜的技術和技術群的應用和集成,要按工程科學實施。大規模風電開髮是目標要求明確的大型工程,成本、質量、效率必鬚三者併重。大規模風電受地理、噹地經濟和電網等多因素製約,應由國傢能源主管部門進行規劃、建設、運行和用電的整體協調。為瞭保證大型風電基地的可持續髮展,其必鬚要與環境、生態協調一緻。
침대2011년발생적대규모풍전궤조탈망사고급2012년이래출현적엄중기풍현상,결합대형공정일반발전규률,이주천풍전기지위실례,통과분석기건설운행과정중적각충현상급폭로출적문제,탐토제출대형풍전기지정체발전적궤개특점。대형풍전기지개발시일항공정활동,필수준순공정고유자연과학규률。대규모풍전개발시복잡적기술화기술군적응용화집성,요안공정과학실시。대규모풍전개발시목표요구명학적대형공정,성본、질량、효솔필수삼자병중。대규모풍전수지리、당지경제화전망등다인소제약,응유국가능원주관부문진행규화、건설、운행화용전적정체협조。위료보증대형풍전기지적가지속발전,기필수요여배경、생태협조일치。
For solving problems of the consecutive large-scale wind turbine tripping in 2011 and serious wind power curtailment since 2012, a variety of phenomena and problems exposed in the construction and operation process of Jiuquan wind base are analyzed, with consideration of the general development law of large-scale projects, some overall characteristics of large-scale wind power base are put forward. The large wind power base development is an engineering activity and the engineering has its law and its law must be observed. Large-scale wind power, which is the complicated application of technologies and integration of technology aggregation, must be implemented according to engineering science. It is a huge project to be completed through construction, the efforts of the construction must be focused equally on cost, quality and efficiency. Its planning, construction, operation and energy consumption should be coordinated by the state governing department in charge of national energy. It must harmonize with the environment and ecology to ensure the sustainable development of large-scale wind energy.