针对阳泉市开发区古城小区B4号楼冬期大体积混凝土筏板基础的现场情况,从材料选择、混凝土配比、施工工艺、混凝土测温等诸多因素入手,探讨了具体的施工技术并作了阐述,以保证混凝土工程的施工质量。
針對暘泉市開髮區古城小區B4號樓鼕期大體積混凝土筏闆基礎的現場情況,從材料選擇、混凝土配比、施工工藝、混凝土測溫等諸多因素入手,探討瞭具體的施工技術併作瞭闡述,以保證混凝土工程的施工質量。
침대양천시개발구고성소구B4호루동기대체적혼응토벌판기출적현장정황,종재료선택、혼응토배비、시공공예、혼응토측온등제다인소입수,탐토료구체적시공기술병작료천술,이보증혼응토공정적시공질량。
According to the site situation of winter mass concrete raft foundation of Yangquan development zone Gucheng B4 building, from the materials selection, concrete mix proportion, construction technology, concrete temperature measurement and many other factors, discussed the specific construction technology and made elaboration, in order to ensure the construction quality of concrete engineering.