JOURNAL OF HEBEI INSTITUTE OF ARCHITECTURAL ENGINEERING
2014年
3期
50-53,56
,共5页
支护%优化方案%动态监测%数值模拟
支護%優化方案%動態鑑測%數值模擬
지호%우화방안%동태감측%수치모의
supporting%optimization program%dynamic monitoring%numerical simulation
采用三维仿真数值模拟、监控量测等手段对张承高速草帽山黄土隧道浅埋偏压段开挖及支护进行了分析,利用分析结果对施工方案进行了优化。
採用三維倣真數值模擬、鑑控量測等手段對張承高速草帽山黃土隧道淺埋偏壓段開挖及支護進行瞭分析,利用分析結果對施工方案進行瞭優化。
채용삼유방진수치모의、감공량측등수단대장승고속초모산황토수도천매편압단개알급지호진행료분석,이용분석결과대시공방안진행료우화。
Numerical simulation of three-dimensional simulation,and monitoring and measuring meth-ods are used in the analysis of the excavation and supporting technology in Caomao Mountain lo-ess tunnel of Zhangjiakou-Chengde Expressway,the results of which are used to optimize the con-struction program.