本次模拟研究区域主要集中在-580m中段,新城金矿Ⅴ#采用上向分层尾砂(胶结)充填采矿法,中段高50m,一个中段含5个分段,一个分段分3个分层。
本次模擬研究區域主要集中在-580m中段,新城金礦Ⅴ#採用上嚮分層尾砂(膠結)充填採礦法,中段高50m,一箇中段含5箇分段,一箇分段分3箇分層。
본차모의연구구역주요집중재-580m중단,신성금광Ⅴ#채용상향분층미사(효결)충전채광법,중단고50m,일개중단함5개분단,일개분단분3개분층。
The simulation study area is mainly concentrated in the middle of-580m. The upward slicing mining law of tail (cemented) filling is used in Ⅴ# in Xincheng Gold Mine. The middle high is 50m, and it contains 5 subparagraphs, and each subparagraph contains 3 hierarchies.