价值工程
價值工程
개치공정
VALUE ENGINEERING
2014年
35期
67-68
,共2页
锅炉%垂直段水冷壁%安装%施工方案
鍋爐%垂直段水冷壁%安裝%施工方案
과로%수직단수랭벽%안장%시공방안
boiler%vertical segment water wall%installation%construction scheme
基于陕西府谷清水川煤电一体化项目电厂二期(2×1000MW)工程总体建设要求,分析#4机组锅炉水冷壁设计垂直管屏与螺旋管圈联合布置情况,明确垂直段水冷壁施工方案,并重点分析安装过程中的改进措施和注意事项,以供同行参阅。
基于陝西府穀清水川煤電一體化項目電廠二期(2×1000MW)工程總體建設要求,分析#4機組鍋爐水冷壁設計垂直管屏與螺鏇管圈聯閤佈置情況,明確垂直段水冷壁施工方案,併重點分析安裝過程中的改進措施和註意事項,以供同行參閱。
기우협서부곡청수천매전일체화항목전엄이기(2×1000MW)공정총체건설요구,분석#4궤조과로수랭벽설계수직관병여라선관권연합포치정황,명학수직단수랭벽시공방안,병중점분석안장과정중적개진조시화주의사항,이공동행삼열。
Based on the general construction requirements of the coal and electricity integration project phase 2 project of Qingshuichuan Power Plant of Fugu County Shaanxi Province, this paper analyzes the joint arrangement of the vertical tube panel and helical tube coil of the design of water wall in #4 unit, defines the construction scheme of vertical segment water wall and mainly analyzes the improvement measures and matters needing attention in the installation process to provide references for the colleagues.