不良地质条件%隧道%地质预报%监控量测%合理工序
不良地質條件%隧道%地質預報%鑑控量測%閤理工序
불량지질조건%수도%지질예보%감공량측%합리공서
adverse geological conditions%tunnel%geological forecast%monitoring and measurement%reasonable process
以复杂围岩条件下的浅埋偏压隧道为工程背景,采用地震波反射法,进行了超前地质预报分析,研究其在围岩级别不良条件下的适应性,并进行了围岩开挖期间的监控量测,总结了复杂围岩条件下的CRD工法合理工序.
以複雜圍巖條件下的淺埋偏壓隧道為工程揹景,採用地震波反射法,進行瞭超前地質預報分析,研究其在圍巖級彆不良條件下的適應性,併進行瞭圍巖開挖期間的鑑控量測,總結瞭複雜圍巖條件下的CRD工法閤理工序.
이복잡위암조건하적천매편압수도위공정배경,채용지진파반사법,진행료초전지질예보분석,연구기재위암급별불량조건하적괄응성,병진행료위암개알기간적감공량측,총결료복잡위암조건하적CRD공법합리공서.
Taking shallow bias tunnel under complex rock conditions as engineering background, this paper uses seismic reflection method to conduct advanced geological forecast analysis and study its adaptability under adverse conditions of the surrounding rock, and conducts monitoring and measurement during surrounding rock excavation, and summarizes the reasonable process of CRD construction method under complex rock conditions.