根据配电系统网络变结构特点和负荷灵活控制特性,提出了针对故障情况下的含分布式电源配网结构优化策略,将其分解成孤岛划分与剩余网络重构2个子问题.将包含系
根據配電繫統網絡變結構特點和負荷靈活控製特性,提齣瞭針對故障情況下的含分佈式電源配網結構優化策略,將其分解成孤島劃分與剩餘網絡重構2箇子問題.將包含繫
근거배전계통망락변결구특점화부하령활공제특성,제출료침대고장정황하적함분포식전원배망결구우화책략,장기분해성고도화분여잉여망락중구2개자문제.장포함계
According to the feature of variable structure of distribution network and flexible control property of load, a structure optimization strategy for faulted distribution network containing distribution generations is proposed and divided into two subproblems, namely island partitioning and reconfiguration of residual network. The subproblem of island partitioning is turned into satisfiability problem, in the first stage the implicit enumeration is utilized to obtain the initial partitioning scheme, and in the second stage by means of checking static survivability constraint and combining with power flow calculation, in which the network loss is taken into account, the interrupted amount of local interruptible load is modified and the amount of reactive power compensation is determined, thus the final island partitioning scheme is attained. The optimal switcher combination in the subproblem of reconfiguration of residual network is solved by ant colony algorithm. The effectiveness of the proposed strategy is verified by calculation results of a certain actual distribution network with 70 buses.