城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2012年
22期
75-76
,共2页
围岩分级%支护%应力应变%施工监控%隧道施工动态管理
圍巖分級%支護%應力應變%施工鑑控%隧道施工動態管理
위암분급%지호%응력응변%시공감공%수도시공동태관리
surrounding rock classification%support%stress and strain%construction monitoring%tunnel construction%dyna-mic management
本文笔者论述了舜山隧道工程的基本概况,并通过开挖方法的确定和施工应力应变计算的分析,确定现场的监测方法应和变监测系统的设立,从而控制数据的确定与处理.
本文筆者論述瞭舜山隧道工程的基本概況,併通過開挖方法的確定和施工應力應變計算的分析,確定現場的鑑測方法應和變鑑測繫統的設立,從而控製數據的確定與處理.
본문필자논술료순산수도공정적기본개황,병통과개알방법적학정화시공응력응변계산적분석,학정현장적감측방법응화변감측계통적설립,종이공제수거적학정여처리.
The author of this article discusses the basic situa-teion of the shun mountain tunnel project, and through the exc-avation method to determine and the analysis of the stress and strain calculation in construction, determines the monitoring methods should change the establishment of monitoring syste-m, so as to control data set and processing.