汛末蓄水%航道条件%优化调度%三峡水库
汛末蓄水%航道條件%優化調度%三峽水庫
신말축수%항도조건%우화조도%삼협수고
water storage at the end of flood period%waterway condition%optimal operation%the Three Gorges Reservoir
根据实测资料分析了三峡水库汛末蓄水对长江中游航道条件的影响,在此基础上,对正常运行期的蓄水调度方案进行了优化探讨.研究结果初步认为:目前水库蓄水时间必须提前至9月,宜昌下泄流量应大于10000~12000 m3/s,每日流量变幅不宜超过1500 m3/s.
根據實測資料分析瞭三峽水庫汛末蓄水對長江中遊航道條件的影響,在此基礎上,對正常運行期的蓄水調度方案進行瞭優化探討.研究結果初步認為:目前水庫蓄水時間必鬚提前至9月,宜昌下洩流量應大于10000~12000 m3/s,每日流量變幅不宜超過1500 m3/s.
근거실측자료분석료삼협수고신말축수대장강중유항도조건적영향,재차기출상,대정상운행기적축수조도방안진행료우화탐토.연구결과초보인위:목전수고축수시간필수제전지9월,의창하설류량응대우10000~12000 m3/s,매일류량변폭불의초과1500 m3/s.
Based on the measured data, the effects of the Three Gorges Reservoir filling at the end of the flood season on waterway condition in middle reach of Yangtze River were analyzed. On that basis, optimization of the reservoir operation mode in the normal operation period was discussed. The results generally show that the water storage time must be arranged in September early.The outlet discharge of Yichang should be greater than 10 000~12 000 m3/s, and the daily discharge variation amplitude should not be more than 1 500 m3/s.