施工支洞%塌方%处理%措施
施工支洞%塌方%處理%措施
시공지동%탑방%처리%조시
Construction adit%collapse%treatment%measure
针对糯扎渡水电站地下引水发电系统6#施工支洞施工过程中的坍塌事故,分析其原因,按“固定后方,稳定前方”的处理原则,采用了固结堆渣体、小管棚超前支护、短进尺、弱爆破、强支护等施工处理措施,取得了良好效果,确保了施工质量及安全.
針對糯扎渡水電站地下引水髮電繫統6#施工支洞施工過程中的坍塌事故,分析其原因,按“固定後方,穩定前方”的處理原則,採用瞭固結堆渣體、小管棚超前支護、短進呎、弱爆破、彊支護等施工處理措施,取得瞭良好效果,確保瞭施工質量及安全.
침대나찰도수전참지하인수발전계통6#시공지동시공과정중적담탑사고,분석기원인,안“고정후방,은정전방”적처리원칙,채용료고결퇴사체、소관붕초전지호、단진척、약폭파、강지호등시공처리조시,취득료량호효과,학보료시공질량급안전.
@@@@Collapse had ever occurred during construction of underground powerhouse No.6 adit of Nuozhadu Hy?dropower Station. The causes were analyzed. According to the principle of fixing rear and stabilizing front,the ad?opted treatment measures include consolidation of slag heap,tubule shed advance support,short advancing foot?age,weak blasting,strengthened support,which rendered good effects and ensured construction quality and safety.