鄂东长江公路大桥%混合主梁%加载合龙
鄂東長江公路大橋%混閤主樑%加載閤龍
악동장강공로대교%혼합주량%가재합룡
Edong Highway Bridge over Changjiang River%hybrid girder%loading closure
主跨926 m的鄂东长江公路大桥是一座边跨为混凝土梁,中跨为钢箱梁的混合主梁斜拉桥.根据该桥的结构特点,分析合龙条件、不同合龙方案对成桥线形和应力的影响,最终确定采取加载合龙的施工技术.文中介绍了加载合龙的具体流程、关键技术及实施效果,为同类型桥梁提供参考.
主跨926 m的鄂東長江公路大橋是一座邊跨為混凝土樑,中跨為鋼箱樑的混閤主樑斜拉橋.根據該橋的結構特點,分析閤龍條件、不同閤龍方案對成橋線形和應力的影響,最終確定採取加載閤龍的施工技術.文中介紹瞭加載閤龍的具體流程、關鍵技術及實施效果,為同類型橋樑提供參攷.
주과926 m적악동장강공로대교시일좌변과위혼응토량,중과위강상량적혼합주량사랍교.근거해교적결구특점,분석합룡조건、불동합룡방안대성교선형화응력적영향,최종학정채취가재합룡적시공기술.문중개소료가재합룡적구체류정、관건기술급실시효과,위동류형교량제공삼고.
The Edong Highway Bridge over the Changjiang River with a 926 m main span is a hybrid girder cable-stayed bridge with its side span being a concrete beam and mid-span being a steel box girder. According to the structural characteris-tics of the bridge, the effect on the bridge geometry and stress by closure conditions and different closure schemes is analyzed, and the construction scheme of loading closure is finally decided. This paper introduces the specific process, key technology and implementation effect of the closure process, providing references for same types of bridges.