对南方电网提出静态电压稳定分析三种应用方式,即地区电网静态电压稳定分析、交流断面靜稳极限功率计算和低压减载校核计算,并用时域仿真验证校核对了计算结果.第一种方式是最基本应用方式,采用连续潮流方法可得到P-V曲线,从而得到各区域负荷有功功率裕度以及静态电压稳定储备系数,利用模态分析可给出电压薄弱厂站母线.在第二种应用方式中,通过增减交流断面两侧的发电出力,并考虑断面可能的“N-1”“N-2”故障,可以从静态电压稳定计算得到断面的极限功率.对于第三种方式,以玉林地区“N–2”故障为例进行了低压减载策略校核计算,可求取最小切负荷量.
對南方電網提齣靜態電壓穩定分析三種應用方式,即地區電網靜態電壓穩定分析、交流斷麵靜穩極限功率計算和低壓減載校覈計算,併用時域倣真驗證校覈對瞭計算結果.第一種方式是最基本應用方式,採用連續潮流方法可得到P-V麯線,從而得到各區域負荷有功功率裕度以及靜態電壓穩定儲備繫數,利用模態分析可給齣電壓薄弱廠站母線.在第二種應用方式中,通過增減交流斷麵兩側的髮電齣力,併攷慮斷麵可能的“N-1”“N-2”故障,可以從靜態電壓穩定計算得到斷麵的極限功率.對于第三種方式,以玉林地區“N–2”故障為例進行瞭低壓減載策略校覈計算,可求取最小切負荷量.
대남방전망제출정태전압은정분석삼충응용방식,즉지구전망정태전압은정분석、교류단면정은겁한공솔계산화저압감재교핵계산,병용시역방진험증교핵대료계산결과.제일충방식시최기본응용방식,채용련속조류방법가득도P-V곡선,종이득도각구역부하유공공솔유도이급정태전압은정저비계수,이용모태분석가급출전압박약엄참모선.재제이충응용방식중,통과증감교류단면량측적발전출력,병고필단면가능적“N-1”“N-2”고장,가이종정태전압은정계산득도단면적겁한공솔.대우제삼충방식,이옥임지구“N–2”고장위례진행료저압감재책략교핵계산,가구취최소절부하량.
Three kinds of applications are presented for China Southern Power Grid (CSG) in this paper, i.e. analysis of static voltage in local grid, calculation of AC interface maximum transfer power and strategy-checking calculation of undervoltage load shedding, and for these applications the calculation results are verified by time-domain simulation. The first kind is a main application, and in the analysis the P-V curves can be traced by using continuation power flow method, and thus the regional load active power margin and static voltage stability reserve factor can be obtained and the voltage weak buses are detected with modal analysis. In the second kind of application, by regulating the power generation in two sides of the interface and considering N–1/N–2 contingencies on interface, the limit power of the interface can be calculated. As to the third kind, taking the Yulin network with N–2 contingency as an example, the strategy checking calculation of undervoltage load shedding is carried out, resulting in the maximum shedding load.