大电机技术
大電機技術
대전궤기술
LARGE ELECTRIC MACHINE AND HYDRAULIC TURBINE
2013年
2期
63-66
,共4页
小湾水电站%顶盖取水%试验
小灣水電站%頂蓋取水%試驗
소만수전참%정개취수%시험
Xiaowan hydropower plant%getting unit cooling water from turbine head%experiment
介绍澜沧江小湾水电站顶盖取水试验,并对试验情况进行一定研究分析,供相关人员参考.
介紹瀾滄江小灣水電站頂蓋取水試驗,併對試驗情況進行一定研究分析,供相關人員參攷.
개소란창강소만수전참정개취수시험,병대시험정황진행일정연구분석,공상관인원삼고.
A brief introduction to the experiment of getting unit cooling water from turbine head cover in Xiaowan hydropower plant was presented. Several important findings are achieved based on the analysis of the results of the experiment.