本文介绍了在GPS控制测量中对起算点分析和处理方法,提出了一种在联测起算点前对起算点投影变形的概算新思路,并给出了厂区GPS控制测量起算点分析和处理的完整流程,最后以一个工程实例进行了验证.
本文介紹瞭在GPS控製測量中對起算點分析和處理方法,提齣瞭一種在聯測起算點前對起算點投影變形的概算新思路,併給齣瞭廠區GPS控製測量起算點分析和處理的完整流程,最後以一箇工程實例進行瞭驗證.
본문개소료재GPS공제측량중대기산점분석화처리방법,제출료일충재련측기산점전대기산점투영변형적개산신사로,병급출료엄구GPS공제측량기산점분석화처리적완정류정,최후이일개공정실례진행료험증.
@@@@?This paper introduced the analysis and processing of initial points in the GPS control survey, and then raised a new thought on the estimating method about projection length deformation of initial points and draw up the flow chart of the analysis and processing of initial points, finally through an engineering project , this method was verified.