针对上思县明江右岸防洪整治工程的地质条件、场地条件等实际情况,充分考虑河道防洪整治和城市建设、市政道路相结合的要求,对防洪护岸堤布置、设计和施工处理等方面进行探讨.实践证明,本工程防洪护岸堤布置是合适的,设计方案是合理可行的.
針對上思縣明江右岸防洪整治工程的地質條件、場地條件等實際情況,充分攷慮河道防洪整治和城市建設、市政道路相結閤的要求,對防洪護岸隄佈置、設計和施工處理等方麵進行探討.實踐證明,本工程防洪護岸隄佈置是閤適的,設計方案是閤理可行的.
침대상사현명강우안방홍정치공정적지질조건、장지조건등실제정황,충분고필하도방홍정치화성시건설、시정도로상결합적요구,대방홍호안제포치、설계화시공처리등방면진행탐토.실천증명,본공정방홍호안제포치시합괄적,설계방안시합리가행적.
The Mingjiang River right bank flood protection project was designed according to the geological and top?ographical conditions, while fully taking into consideration the requirements for combining river flood protection works with urban and municipal road construction. The author discussed the layout, design and construction of bank protection dike. As demonstrated by practice, the bank flood protection dike layout of this project is proper; the de?sign scheme is rational and feasible.