宁波大学学报(理工版)
寧波大學學報(理工版)
저파대학학보(리공판)
JOURNAL OF NINGBO UNIVERSITY (NSEE)
2013年
1期
122-126
,共5页
三岔双向挤扩灌注桩%施工工艺%质量控制
三岔雙嚮擠擴灌註樁%施工工藝%質量控製
삼차쌍향제확관주장%시공공예%질량공제
cast-in-place piles with expanded branches and bells by 3-way extruding arms%construction process%quality control
通过工程实例分析了三岔双向挤扩灌注桩(简称DX桩)的施工工艺和技术要求;经静荷载试验验证了基桩的竖向抗压承载力、抗水平力及抗拔力都大大提高;结合提出的施工过程中相应的质量控制措施. DX桩能够使建筑结构更加稳定,沉降变形小,有节约材料,降低工程成本的良好效果.
通過工程實例分析瞭三岔雙嚮擠擴灌註樁(簡稱DX樁)的施工工藝和技術要求;經靜荷載試驗驗證瞭基樁的豎嚮抗壓承載力、抗水平力及抗拔力都大大提高;結閤提齣的施工過程中相應的質量控製措施. DX樁能夠使建築結構更加穩定,沉降變形小,有節約材料,降低工程成本的良好效果.
통과공정실례분석료삼차쌍향제확관주장(간칭DX장)적시공공예화기술요구;경정하재시험험증료기장적수향항압승재력、항수평력급항발력도대대제고;결합제출적시공과정중상응적질량공제조시. DX장능구사건축결구경가은정,침강변형소,유절약재료,강저공정성본적량호효과.
Based on some engineering examples, the author analyses some key construction technologies and technical requirements of DX piles, proving that increasing the vertical compression strength improves the anti-horizontal force and uplift resistance of the base pile. Also proven is that, using this technique, the building structure is more stabilized with settlement and deformation reduced.