探矿工程-岩土钻掘工程
探礦工程-巖土鑽掘工程
탐광공정-암토찬굴공정
EXPLORATION ENGINEERING (DRILLING & TUNNELING)
2013年
2期
40-43
,共4页
杨宽才%田敏%曾石友%蔡记华
楊寬纔%田敏%曾石友%蔡記華
양관재%전민%증석우%채기화
绳索取心液动潜孔锤%钻探%孔斜%小秦岭金矿
繩索取心液動潛孔錘%鑽探%孔斜%小秦嶺金礦
승색취심액동잠공추%찬탐%공사%소진령금광
wire-line coring hydro-hammer%drilling%borehole deviation%Xiaoqinling gold ore
介绍了SYZX75型绳索取心液动潜孔锤在河南省灵宝市小秦岭金矿区的试验应用及其效果.试验结果表明,钻探台月效率、平均时效、回次长度和破碎地层岩心采取率均有明显提高,钻探成本下降,防止孔斜效果好,值得进一步推广.
介紹瞭SYZX75型繩索取心液動潛孔錘在河南省靈寶市小秦嶺金礦區的試驗應用及其效果.試驗結果錶明,鑽探檯月效率、平均時效、迴次長度和破碎地層巖心採取率均有明顯提高,鑽探成本下降,防止孔斜效果好,值得進一步推廣.
개소료SYZX75형승색취심액동잠공추재하남성령보시소진령금광구적시험응용급기효과.시험결과표명,찬탐태월효솔、평균시효、회차장도화파쇄지층암심채취솔균유명현제고,찬탐성본하강,방지공사효과호,치득진일보추엄.
The paper introduced the application of SYZX75 wire-line coring hydro-hammer in Xiaoqinling gold ore deposit of Lingbao City of Henan Province with the application effects.The field trial results show that the unit monthly drilling effi-ciency, average hour efficiency, round trip length and core recovery rate in cracked formation are improved obviously with lower drilling cost and better protection effect of borehole deviation.