杭州粉砂地层中,杭州沿江大道运河隧道工程施工中因泥水盾构刀盘被砂土裹牢受困无法转动而被迫停工.分析该工程盾构刀盘受困的原因,介绍处理措施及其环境影响,在此基础上提出预防泥水盾构刀盘在砂性土层掘进束缚受困的措施.分析表明:泥水盾构刀盘粉砂土地层中束缚受困后,切口正前方地面开槽,通过高压喷射水流冲射刀盘上附着砂土使其离散脱落的措施是安全可行的;开槽时应加强对周围环境的监控,避免开槽引起周围土层和已建成隧道结构的位移过大.泥水盾构在粉砂土层中掘进时,为避免刀盘被砂土束缚而无法转动,应保证泥水循环的通畅连续,确保泥膜质量,并适当提高泥水压力以维持开挖面稳定,提高泥水携带砂土的能力;盾构非掘进状态下,应定时转动刀盘,避免长时间停机、开挖面无泥水循环时砂土塌落沉淀附着刀盘.
杭州粉砂地層中,杭州沿江大道運河隧道工程施工中因泥水盾構刀盤被砂土裹牢受睏無法轉動而被迫停工.分析該工程盾構刀盤受睏的原因,介紹處理措施及其環境影響,在此基礎上提齣預防泥水盾構刀盤在砂性土層掘進束縳受睏的措施.分析錶明:泥水盾構刀盤粉砂土地層中束縳受睏後,切口正前方地麵開槽,通過高壓噴射水流遲射刀盤上附著砂土使其離散脫落的措施是安全可行的;開槽時應加彊對週圍環境的鑑控,避免開槽引起週圍土層和已建成隧道結構的位移過大.泥水盾構在粉砂土層中掘進時,為避免刀盤被砂土束縳而無法轉動,應保證泥水循環的通暢連續,確保泥膜質量,併適噹提高泥水壓力以維持開挖麵穩定,提高泥水攜帶砂土的能力;盾構非掘進狀態下,應定時轉動刀盤,避免長時間停機、開挖麵無泥水循環時砂土塌落沉澱附著刀盤.
항주분사지층중,항주연강대도운하수도공정시공중인니수순구도반피사토과뢰수곤무법전동이피박정공.분석해공정순구도반수곤적원인,개소처리조시급기배경영향,재차기출상제출예방니수순구도반재사성토층굴진속박수곤적조시.분석표명:니수순구도반분사토지층중속박수곤후,절구정전방지면개조,통과고압분사수류충사도반상부착사토사기리산탈락적조시시안전가행적;개조시응가강대주위배경적감공,피면개조인기주위토층화이건성수도결구적위이과대.니수순구재분사토층중굴진시,위피면도반피사토속박이무법전동,응보증니수순배적통창련속,학보니막질량,병괄당제고니수압력이유지개알면은정,제고니수휴대사토적능력;순구비굴진상태하,응정시전동도반,피면장시간정궤、개알면무니수순배시사토탑락침정부착도반.
During slurry shield tunnelling in silty sands during construction of Hangzhou Canal Tunnel,the cutter head of shield was trapped by sand adhesion. Due to the additional torque imposed by adherent sands,the cutter head stopped to rotate. The reasons for trap of shield?s cutter head were analyzed,and the measures taken to relieve the cutter head were described. Based on experiences and lessons learned from this case study,measures to avoid trap of slurry shield?s cutter head by adhesion of sands in silty sands were presented. In order to relieve the trapped cutter head,a pit was excavated at the front ground,and then high-pressure water jetting was used to clear sands adhered to the cutter head. Practice shows that the measures taken in this case were safe and effective for relieving the trapped shield?s cutter head. Attention should be paid to ensure the safety of surrounding environments, especially the completed tunnel nearby when the pit is excavated. To avoid the cutter head of slurry shield being trapped by sands while tunnelling in silty sands,unobstructed and continuous slurry circulation should be maintained,high-quality slurry should be guaranteed to balance the excavating face,the ability to sweep away sands should be enhanced,and the cutter head should be rotated at set intervals when the shield stops to assemble the segmental linings.