在地铁隧道实际施工过程中,围岩处于加、卸载的复杂变化过程中.隧道的开挖与支护过程是一个多步骤的、且上一步开挖都会对随后的各次开挖产生影响的复杂过程.依据地下工程问题的特点,即“先受力,后开挖,再支护”,描述并模拟地铁隧道开挖卸荷效应下的真实施工过程.对地铁隧道施工中开挖卸荷效应进行详细分析,提出模拟地铁隧道开挖卸荷效应的四阶段模拟方法.以北京地铁8号线二期01标段西清区间隧道为工程背景,对地铁隧道盾构施工真实过程和开挖卸荷效应进行数值模拟与计算.分析开挖面支护力、支护时机、填充注浆以及考虑与不考虑开挖卸荷效应等因素对地铁隧道开挖与支护的影响,获得基于开挖卸荷效应的地铁隧道盾构施工的围岩–支护作用机制.
在地鐵隧道實際施工過程中,圍巖處于加、卸載的複雜變化過程中.隧道的開挖與支護過程是一箇多步驟的、且上一步開挖都會對隨後的各次開挖產生影響的複雜過程.依據地下工程問題的特點,即“先受力,後開挖,再支護”,描述併模擬地鐵隧道開挖卸荷效應下的真實施工過程.對地鐵隧道施工中開挖卸荷效應進行詳細分析,提齣模擬地鐵隧道開挖卸荷效應的四階段模擬方法.以北京地鐵8號線二期01標段西清區間隧道為工程揹景,對地鐵隧道盾構施工真實過程和開挖卸荷效應進行數值模擬與計算.分析開挖麵支護力、支護時機、填充註漿以及攷慮與不攷慮開挖卸荷效應等因素對地鐵隧道開挖與支護的影響,穫得基于開挖卸荷效應的地鐵隧道盾構施工的圍巖–支護作用機製.
재지철수도실제시공과정중,위암처우가、사재적복잡변화과정중.수도적개알여지호과정시일개다보취적、차상일보개알도회대수후적각차개알산생영향적복잡과정.의거지하공정문제적특점,즉“선수력,후개알,재지호”,묘술병모의지철수도개알사하효응하적진실시공과정.대지철수도시공중개알사하효응진행상세분석,제출모의지철수도개알사하효응적사계단모의방법.이북경지철8호선이기01표단서청구간수도위공정배경,대지철수도순구시공진실과정화개알사하효응진행수치모의여계산.분석개알면지호력、지호시궤、전충주장이급고필여불고필개알사하효응등인소대지철수도개알여지호적영향,획득기우개알사하효응적지철수도순구시공적위암–지호작용궤제.
During the actual construction process of subway tunnel,the surrounding rock is in a complex process of loading and unloading. Meanwhile,the excavation and support are completed in multiple steps. During this process,the previous excavation step will influence the subsequent excavation. Based on the characteristics of underground engineering,that is,loads are applied first,then excavation is conducted,and supports are provided at last,the actual construction process of subway tunnel under excavation unloading effect was described and simulated. The excavation unloading effect during the process of subway tunnel construction was analyzed in detail;and the 4-stage simulation method was put forward,which can simulate the excavation unloading effect during the construction process of subway tunnel. Taking the tunnel in Xisanqi—Qinghe section of Beijing metro line No.8 as engineering background,the actual process of shield construction of subway tunnel and the excavation unloading effect were simulated. The effects of excavation face supporting pressure,supporting time and filled grouting on excavation and support of metro tunnel were studied,with and without consideration of the excavation unloading effect. The surrounding rock-support working mechanism of metro shield tunnel was obtained based on the excavation unloading effect.