水科学与工程技术
水科學與工程技術
수과학여공정기술
WATER SCIENCES AND ENGINEERING TECHNOLOGY
2013年
2期
4-6
,共3页
缪萍萍%任喜龙%李博超%高蛟%严阔
繆萍萍%任喜龍%李博超%高蛟%嚴闊
무평평%임희룡%리박초%고교%엄활
分水枢纽改造工程%石门子村支流%设计洪水%洪水水面线
分水樞紐改造工程%石門子村支流%設計洪水%洪水水麵線
분수추뉴개조공정%석문자촌지류%설계홍수%홍수수면선
water diversion hub renovation project%Shimenzi village tributaries flood%design flood level%flood water sur-face line
桃林口水库下游分水枢纽改造工程的实施,抬高了坝址处设计洪水位,顶托了石门子村支流洪水,利用一维恒定非均匀流计算方法,分析了工程改造对区间石门子村支流洪水的影响.
桃林口水庫下遊分水樞紐改造工程的實施,抬高瞭壩阯處設計洪水位,頂託瞭石門子村支流洪水,利用一維恆定非均勻流計算方法,分析瞭工程改造對區間石門子村支流洪水的影響.
도림구수고하유분수추뉴개조공정적실시,태고료패지처설계홍수위,정탁료석문자촌지류홍수,이용일유항정비균균류계산방법,분석료공정개조대구간석문자촌지류홍수적영향.
The Taolinkou reservoir downstream water diversion hub renovation project has elevated the design flood level and backwatered the Shimenzi Village tributaries flood. Using the one-dimensional steady nonuniform flow calculation method, the paper has analyzed the impact of renovation project on the tributaries flood.