水科学与工程技术
水科學與工程技術
수과학여공정기술
WATER SCIENCES AND ENGINEERING TECHNOLOGY
2013年
2期
81-82
,共2页
洺河渡槽%试验桩%桩底压浆%静载试验
洺河渡槽%試驗樁%樁底壓漿%靜載試驗
명하도조%시험장%장저압장%정재시험
Ming River aqueduct%test pile%pile-bottom grouting%static loading test
洺河渡槽通过3根试验桩的桩底压浆前后静载对比试验,测定桩底压浆对桩周侧摩阻力和端承力的增强效果,为桩底压浆提供设计计算参数和施工工艺参数.
洺河渡槽通過3根試驗樁的樁底壓漿前後靜載對比試驗,測定樁底壓漿對樁週側摩阻力和耑承力的增彊效果,為樁底壓漿提供設計計算參數和施工工藝參數.
명하도조통과3근시험장적장저압장전후정재대비시험,측정장저압장대장주측마조력화단승력적증강효과,위장저압장제공설계계산삼수화시공공예삼수.
Through the static load comparative tests before and after pile-bottom grouting of three test piles in Ming River aqueduct, determining the effect of the pile bottom grouting on pile side friction resistance and end bearing capacity, pro-viding the design calculation parameters and construction process parameters for the pile bottom grouting.