阐述了某热源厂116 MW循环流化床热水锅炉的结构特点,制定了适合流化床热水锅炉启动调试过程中的煮炉方案,分析了热水锅炉频繁启停以及带负荷试运阶段锅炉出水压力波动大等原因,为循环流化床热水锅炉调试及运行提出了建议.
闡述瞭某熱源廠116 MW循環流化床熱水鍋爐的結構特點,製定瞭適閤流化床熱水鍋爐啟動調試過程中的煮爐方案,分析瞭熱水鍋爐頻繁啟停以及帶負荷試運階段鍋爐齣水壓力波動大等原因,為循環流化床熱水鍋爐調試及運行提齣瞭建議.
천술료모열원엄116 MW순배류화상열수과로적결구특점,제정료괄합류화상열수과로계동조시과정중적자로방안,분석료열수과로빈번계정이급대부하시운계단과로출수압력파동대등원인,위순배류화상열수과로조시급운행제출료건의.
This article states the structural characteristics of the 116 MW circulating fluidized bed’s hot-water boiler of one heat source plant, and then makes the boiling-out plan suitable for the hot-water boiler of the circulating fluidized bed to start up its commissioning process. After analyzing the causes for the hot-water boiler’s frequent shutdown and the fluctuating discharge pressure during the on-load trial operation,this article also proposes suggestions for the commissioning and operation of the circulating fluidized bed’s hot-water boiler.