罗超%杨军%孙元章%林芳%崔明建
囉超%楊軍%孫元章%林芳%崔明建
라초%양군%손원장%림방%최명건
风电%动态经济调度%自动发电控制%备用容量优化%备用容量%机会约束
風電%動態經濟調度%自動髮電控製%備用容量優化%備用容量%機會約束
풍전%동태경제조도%자동발전공제%비용용량우화%비용용량%궤회약속
wind power%dynamic economic dispatch%automatic generation control (AGC)%reserve scheduling%reserve capacity%chance constrained
风电随机性对电力系统安全、经济运行产生深远影响。该文在日前框架下,利用随机优化理论建立考虑辅助服务市场的电力系统动态经济调度模型。该模型除计及常规机组约束、风速预测误差与网络安全约束外,还将系统备用容量需求分解为自动发电控制(automatic generation control,AGC)容量与事故备用容量,考虑2类备用容量运行约束,并将两者购买成本分别计入目标函数,在得到发电机最优出力计划的同时,实现2类备用容量在各机组间的分时段优化分配。采用基于Bootstrap估计的样本平均值方法确定随机变量置信区间以避免复杂的卷积计算,将原问题分解为确定性非线性优化问题和解校验2部分,利用序列二次规划法求解后运用随机模拟方法进行线路潮流约束校验,并依校验结果调整约束条件重新求解。含风电场的IEEE 6机30节点、54机118节点算例验证了模型的正确性和算法的有效性。
風電隨機性對電力繫統安全、經濟運行產生深遠影響。該文在日前框架下,利用隨機優化理論建立攷慮輔助服務市場的電力繫統動態經濟調度模型。該模型除計及常規機組約束、風速預測誤差與網絡安全約束外,還將繫統備用容量需求分解為自動髮電控製(automatic generation control,AGC)容量與事故備用容量,攷慮2類備用容量運行約束,併將兩者購買成本分彆計入目標函數,在得到髮電機最優齣力計劃的同時,實現2類備用容量在各機組間的分時段優化分配。採用基于Bootstrap估計的樣本平均值方法確定隨機變量置信區間以避免複雜的捲積計算,將原問題分解為確定性非線性優化問題和解校驗2部分,利用序列二次規劃法求解後運用隨機模擬方法進行線路潮流約束校驗,併依校驗結果調整約束條件重新求解。含風電場的IEEE 6機30節點、54機118節點算例驗證瞭模型的正確性和算法的有效性。
풍전수궤성대전력계통안전、경제운행산생심원영향。해문재일전광가하,이용수궤우화이론건립고필보조복무시장적전력계통동태경제조도모형。해모형제계급상규궤조약속、풍속예측오차여망락안전약속외,환장계통비용용량수구분해위자동발전공제(automatic generation control,AGC)용량여사고비용용량,고필2류비용용량운행약속,병장량자구매성본분별계입목표함수,재득도발전궤최우출력계화적동시,실현2류비용용량재각궤조간적분시단우화분배。채용기우Bootstrap고계적양본평균치방법학정수궤변량치신구간이피면복잡적권적계산,장원문제분해위학정성비선성우화문제화해교험2부분,이용서렬이차규화법구해후운용수궤모의방법진행선로조류약속교험,병의교험결과조정약속조건중신구해。함풍전장적IEEE 6궤30절점、54궤118절점산례험증료모형적정학성화산법적유효성。
The randomicity of wind power brings so many impacts on safe and economic operation of power system. This paper proposed a dynamic economic dispatch model considering the influence of ancillary service market. The model accounted for the optimal scheduling for reserve besides conventional constraints. The whole reserve demand was decomposed into automatic generation control (AGC) reserve and emergency reserve, whose regulation range and cost were added to the model. A sample average algorithm was used to transform the chance constraints into deterministic ones to avoid complex convolution operation based on Bootstrap test. The corresponding deterministic nonlinear programming was solved with the sequential quadratic programming (SQP) method. The solution was tested with random experiment, and the constraints were adjusted based on in turn. Correctness and effectiveness of the proposed techniques are illustrated in IEEE 30 and 118 systems with wind farms respectively.