长江工程职业技术学院学报
長江工程職業技術學院學報
장강공정직업기술학원학보
JOURNAL OF CHANGJIANG ENGINEERING VOCATIONAL COLLEGE
2014年
4期
5-6
,共2页
流量间测%水位流量关系%流量误差%雁石坪水文站
流量間測%水位流量關繫%流量誤差%雁石坪水文站
류량간측%수위류량관계%류량오차%안석평수문참
indirect measurement of flow%stage-discharge relation%flow error%Yanshiping Hy-drometric Station
为了验证雁石坪水文站间测方案是否可行,按照《雁石坪水文站巡测方案》的规定,在现有巡测的基础上,对该水文站流量进行间测分析,主要是采用综合水位流量关系曲线对照规范进行误差统计计算分析,论证此方案的可行性。
為瞭驗證雁石坪水文站間測方案是否可行,按照《雁石坪水文站巡測方案》的規定,在現有巡測的基礎上,對該水文站流量進行間測分析,主要是採用綜閤水位流量關繫麯線對照規範進行誤差統計計算分析,論證此方案的可行性。
위료험증안석평수문참간측방안시부가행,안조《안석평수문참순측방안》적규정,재현유순측적기출상,대해수문참류량진행간측분석,주요시채용종합수위류량관계곡선대조규범진행오차통계계산분석,론증차방안적가행성。
In order to test the feasibility of indirect measurement scheme at Yanshiping Hydromet-ric Station,according to the regulations of Indirect Measurement Scheme at Yanshiping Hydro-metric Station and based on the existing indirect measurement,analysis of indirect flow measure-ment at the hydrometric station is carried out,mainly statistical calculation of error is done by u-sing comprehensive stage-discharge relation curve and referring to the regulations.Feasibility of the scheme is demonstrated.