针对兖州矿区某矿提高开采上限的问题,运用现场钻孔原位窥视镜成像方法,对该矿5301-1工作面第一分层开采完毕后导水断裂带的空间发育特征及发育高度进行观测,并结合经验公式计算结果进行了对比分析。在对该工作面的煤层顶底板岩层组合及结构性质特点进行分析的基础上,建立工程地质模型,运用FLAC3D数值模拟方法对其进行验证。3种方法研究得到的导水断裂带高度基本一致:实测结果为24.2 m,经验公式计算结果为26.7 m,数值模拟结果为25.0 m。研究结果可为该工作面提高开采上限煤柱的合理留设提供重要的参考依据。
針對兗州礦區某礦提高開採上限的問題,運用現場鑽孔原位窺視鏡成像方法,對該礦5301-1工作麵第一分層開採完畢後導水斷裂帶的空間髮育特徵及髮育高度進行觀測,併結閤經驗公式計算結果進行瞭對比分析。在對該工作麵的煤層頂底闆巖層組閤及結構性質特點進行分析的基礎上,建立工程地質模型,運用FLAC3D數值模擬方法對其進行驗證。3種方法研究得到的導水斷裂帶高度基本一緻:實測結果為24.2 m,經驗公式計算結果為26.7 m,數值模擬結果為25.0 m。研究結果可為該工作麵提高開採上限煤柱的閤理留設提供重要的參攷依據。
침대연주광구모광제고개채상한적문제,운용현장찬공원위규시경성상방법,대해광5301-1공작면제일분층개채완필후도수단렬대적공간발육특정급발육고도진행관측,병결합경험공식계산결과진행료대비분석。재대해공작면적매층정저판암층조합급결구성질특점진행분석적기출상,건립공정지질모형,운용FLAC3D수치모의방법대기진행험증。3충방법연구득도적도수단렬대고도기본일치:실측결과위24.2 m,경험공식계산결과위26.7 m,수치모의결과위25.0 m。연구결과가위해공작면제고개채상한매주적합리류설제공중요적삼고의거。
To counter the Problem of increasing the mining uPPer limit in a certain mine in Yanzhou Coal Mining Area, observation was carried out on the sPace develoPment characteristics and height of the water flowing fractured zone after the mining of the first slice of 5301-1 working face by using the site borehole in-situ sight-glass imaging method,and comParative analysis was made according to the calculated results with the emPirical formula. Based on the analysis of the structure and ProPerties of the roof and floor rock strata of the coal seam in this working face,an engineering geological model was established and then verified by using FLAC3D numerical simulation method. The height of the water flowing fractured zone which was obtained with three research methods was basically identical:the actually measured result was 24. 2 m,the result obtained with the emPirical formulae was 26. 7 m and the result obtained by numerical simulation was 25. 0 m. These research results Provided an imPortant reference for the reasonable retaining of the waterProof coal Pillar after the mining uPPer limit of this coal face was increased.