河口村水电站设置大电站和小电站,两个电站的运行水头范围、机组安装高程、机组布置型式等均不同。根据电站的布置特点和运行水头范围,通过模型参数比较分析,确定了水轮机机型及主要参数;结合经济和技术性能、运行灵活性等因素,合理选择了机组台数和机组装置型式。
河口村水電站設置大電站和小電站,兩箇電站的運行水頭範圍、機組安裝高程、機組佈置型式等均不同。根據電站的佈置特點和運行水頭範圍,通過模型參數比較分析,確定瞭水輪機機型及主要參數;結閤經濟和技術性能、運行靈活性等因素,閤理選擇瞭機組檯數和機組裝置型式。
하구촌수전참설치대전참화소전참,량개전참적운행수두범위、궤조안장고정、궤조포치형식등균불동。근거전참적포치특점화운행수두범위,통과모형삼수비교분석,학정료수륜궤궤형급주요삼수;결합경제화기술성능、운행령활성등인소,합리선택료궤조태수화궤조장치형식。
There are two hydropower stations in Hekoucun hydropower project. The operation range of water head,setting elevation,unit layout of these two stations are different. According to the characteristics of layout and water head,through comprehensive comparisons and analysis of model parameter,the turbine type and main parameter were determined;combining with the factors of performance of economy and technology,operation flexible and etc. ,the number and type of units were selected rationally,which guaranteed the station operation steady and safety.