中国水能及电气化
中國水能及電氣化
중국수능급전기화
CHINA HYDROPOWER & ELECTRIFICATION
2014年
12期
64-67
,共4页
仙居抽蓄%移民安置%规划
仙居抽蓄%移民安置%規劃
선거추축%이민안치%규화
Xianju pumped storage%resettlement of inhabitant%plan
文章通过系统回顾仙居抽水蓄能电站建设征地移民安置规划设计工作过程,结合建设征地移民安置实施的实际情况,梳理移民安置规划设计过程中生产安置方案、搬迁安置去向等关键问题的处理,总结仙居抽水蓄能电站建设征地移民安置规划设计工作的得失。
文章通過繫統迴顧仙居抽水蓄能電站建設徵地移民安置規劃設計工作過程,結閤建設徵地移民安置實施的實際情況,梳理移民安置規劃設計過程中生產安置方案、搬遷安置去嚮等關鍵問題的處理,總結仙居抽水蓄能電站建設徵地移民安置規劃設計工作的得失。
문장통과계통회고선거추수축능전참건설정지이민안치규화설계공작과정,결합건설정지이민안치실시적실제정황,소리이민안치규화설계과정중생산안치방안、반천안치거향등관건문제적처리,총결선거추수축능전참건설정지이민안치규화설계공작적득실。
In the paper,design process of Xianju Pumped Storage Power Station construction land acquisition resettlement plan is reviewed systematically. Actual condition of construction land acquisition resettlement implementation is combined for arranging production resettlement plan,migration resettlement direction and other key problems in resettlement plan design process. Advantages and disadvantages of Xianju Pumped Storage Power Station construction land acquisition resettlement plan design are summarized.