导流%度汛方案%优化设计
導流%度汛方案%優化設計
도류%도신방안%우화설계
diversion%flood season plan%optimal design
龙背湾水电站工程原施工导流度汛方案大坝临时度汛断面的施工强度高,施工时段还受围堰防渗施工和坝基处理等因素影响,度汛工期偏紧。根据工程地质条件特点,考虑到围堰仅使用一个汛期,适当调整导流度汛方案,可优化施工组织设计,节省工程投资。
龍揹灣水電站工程原施工導流度汛方案大壩臨時度汛斷麵的施工彊度高,施工時段還受圍堰防滲施工和壩基處理等因素影響,度汛工期偏緊。根據工程地質條件特點,攷慮到圍堰僅使用一箇汛期,適噹調整導流度汛方案,可優化施工組織設計,節省工程投資。
룡배만수전참공정원시공도류도신방안대패림시도신단면적시공강도고,시공시단환수위언방삼시공화패기처리등인소영향,도신공기편긴。근거공정지질조건특점,고필도위언부사용일개신기,괄당조정도류도신방안,가우화시공조직설계,절성공정투자。
Original construction diversion flood season plan of Longbei Bay hydropower station has high construction strength in dam temporary flood season cross section. The construction duration is also affected by cofferdam leakage control construction,dam foundation treatment and other factors. The construction schedule in the flood season is tight. Since the cofferdam is used only for one flood season,diversion flood season plan is suitably adjusted for optimizing construction organization design and saving project investment according to geological condition features of the project.