口孜东矿北翼轨道石门尾段埋深大,压力大,掘进后采用“锚架注”支护,变形破坏严重;采用同样的支护形式修复后,仍然变形破坏。为此,对“锚网索喷”+钢管混凝土支架支护进行了研究和应用,取得了成功。巷道支护后,无明显变形,有效地控制了巷道变形破坏,技术经济效益明显。
口孜東礦北翼軌道石門尾段埋深大,壓力大,掘進後採用“錨架註”支護,變形破壞嚴重;採用同樣的支護形式脩複後,仍然變形破壞。為此,對“錨網索噴”+鋼管混凝土支架支護進行瞭研究和應用,取得瞭成功。巷道支護後,無明顯變形,有效地控製瞭巷道變形破壞,技術經濟效益明顯。
구자동광북익궤도석문미단매심대,압력대,굴진후채용“묘가주”지호,변형파배엄중;채용동양적지호형식수복후,잉연변형파배。위차,대“묘망색분”+강관혼응토지가지호진행료연구화응용,취득료성공。항도지호후,무명현변형,유효지공제료항도변형파배,기술경제효익명현。
An end section of a north wing railway cross—cut in East Kouzi Mine was high in depth and pressure. After a heading operation,a “bolt—liner—grouting” support was applied and the deformation failure was serious.With a same support mode applied to the roadway repair,the deformation failure was occurred again. Therefore a study and application on the support of the“bolt—steel mesh—anchor— shotcrete” + steel pipe concrete liner was conducted and a successful application was obtained. After the application,there was no obvious deformation occurred,the deformation failure of the mine road way was effectively controlled and the technical and economic benefit was obvious.