立井%含水层%工作面预注浆%止浆垫
立井%含水層%工作麵預註漿%止漿墊
립정%함수층%공작면예주장%지장점
mine shaft%aquifer%pre-grouting at sinking face%concrete plug
宝山铅锌矿主井深832m ,净直径4?5m。井深606?1~636?1m段细砂岩含水层,涌水量达100m3/h ,采用工作面预注浆技术堵水加固,注浆段高35m ,在工作面构筑止浆垫,分段下行压入式注浆,注浆终压8M Pa。浆液以单液水泥浆为主;双液浆在注浆结束时,用于封孔。注浆后,该含水层涌水量降到了1?8m3/h ,堵水率达98?2%,取得了良好的效果。
寶山鉛鋅礦主井深832m ,淨直徑4?5m。井深606?1~636?1m段細砂巖含水層,湧水量達100m3/h ,採用工作麵預註漿技術堵水加固,註漿段高35m ,在工作麵構築止漿墊,分段下行壓入式註漿,註漿終壓8M Pa。漿液以單液水泥漿為主;雙液漿在註漿結束時,用于封孔。註漿後,該含水層湧水量降到瞭1?8m3/h ,堵水率達98?2%,取得瞭良好的效果。
보산연자광주정심832m ,정직경4?5m。정심606?1~636?1m단세사암함수층,용수량체100m3/h ,채용공작면예주장기술도수가고,주장단고35m ,재공작면구축지장점,분단하행압입식주장,주장종압8M Pa。장액이단액수니장위주;쌍액장재주장결속시,용우봉공。주장후,해함수층용수량강도료1?8m3/h ,도수솔체98?2%,취득료량호적효과。
A mine main shaft of Baoshan Lead and Zinc Mine had a depth of 832m and a net diameter of 4.5m. At a section of 606. 1 ~ 636.1m of the mine shaft,there was a fine sandstone aquifer and a water flow was 100m3 /h. A pre—grouting technology at the mine shaft sinking face was applied to the water sealing and reinforcement. A grouting section was 35m in height. A concrete plug was built at the mine shaft sinking face. A sectional downward pressurized grouting was applied and the final pressure of the grouting was 8MPa. The grout was a single cement grout mainly and a double grout would be applied to seal the borehole when the grouting operation was terminated. After the grouting conducted,the water flow of the aquifer was reduced to 1.8m3 /h,the water sealing rate was at 98.2% and a excellent effect was obtained.