铁道技术监督
鐵道技術鑑督
철도기술감독
2014年
11期
12-14
,共3页
超偏载检测装置%试验%施工组织
超偏載檢測裝置%試驗%施工組織
초편재검측장치%시험%시공조직
Overloading & Unbalanced Loading Inspection Device%Test%Construction Organization
?:为确定高速铁道货车超偏载检测装置的检测性能,呼和浩特铁路局在苏集站京包上行线组织超偏载检测性能验证试验。介绍超偏载检测装置60?km/h以上速度段检测适应性验证试验的试验内容、试验仿真计算结果以及具体的施工组织措施。
?:為確定高速鐵道貨車超偏載檢測裝置的檢測性能,呼和浩特鐵路跼在囌集站京包上行線組織超偏載檢測性能驗證試驗。介紹超偏載檢測裝置60?km/h以上速度段檢測適應性驗證試驗的試驗內容、試驗倣真計算結果以及具體的施工組織措施。
?:위학정고속철도화차초편재검측장치적검측성능,호화호특철로국재소집참경포상행선조직초편재검측성능험증시험。개소초편재검측장치60?km/h이상속도단검측괄응성험증시험적시험내용、시험방진계산결과이급구체적시공조직조시。
For determining the detection performance of Overloading & Unbalanced Loading Inspection Device for high-speed railway freight wagons,Hohhot Railway Administration organizes a test to verify the detection performance of overloading and unbalanced loading in the up direction at Suji station in Jingbao railway,This paper describes the contents of the suitability verification test at the speed of 60km/h an up,the simulation calculation results of the test and the corresponding measures on construction organization.