水科学与工程技术
水科學與工程技術
수과학여공정기술
WATER SCIENCES AND ENGINEERING TECHNOLOGY
2014年
6期
29-31,32
,共4页
安徽白塔河%何庄段%穿河工程%设计洪水
安徽白塔河%何莊段%穿河工程%設計洪水
안휘백탑하%하장단%천하공정%설계홍수
Anhui Baita River%Hezhuang%cross river project%design flood
针对管道防洪安全,对设计洪水采用“84”法及“62”法计算上游设计暴雨和入库洪水,根据调洪演算成果及区间洪水,推求白塔河何庄段设计洪峰流量、水位,为管道工程穿河方案设计提供依据。
針對管道防洪安全,對設計洪水採用“84”法及“62”法計算上遊設計暴雨和入庫洪水,根據調洪縯算成果及區間洪水,推求白塔河何莊段設計洪峰流量、水位,為管道工程穿河方案設計提供依據。
침대관도방홍안전,대설계홍수채용“84”법급“62”법계산상유설계폭우화입고홍수,근거조홍연산성과급구간홍수,추구백탑하하장단설계홍봉류량、수위,위관도공정천하방안설계제공의거。
In order to ensure the safety of flood control, the method of "84" and "62" method was using to calculate the upstream design storm and reservoir flood, according to the results of flood regulating calculation, and interval flood, the de-sign flood peak discharge and water level of Baita River Hezhuang section was developed, it provides a basis for project de-sign of pipeline engineering crossing river.