隧道%基坑%建筑%近接施工%基础
隧道%基坑%建築%近接施工%基礎
수도%기갱%건축%근접시공%기출
tunnel%foundation pit%building%adjacent construction%foundation
重庆市东水门长江大桥与千厮门嘉陵江大桥渝中连接隧道近接重庆市第一人民医院在建门诊大楼,其采用明挖法施工,基坑与在建门诊大楼最近距离约0.6 m。针对该隧道工程,提出基坑间近距离近接部分采用岩土体全部开挖、其余部分采用悬臂桩板墙进行基坑围护的工程方案,并对上述2个区域2种方案的基坑施工分别采用三维与二维有限元进行数值模拟,以评估明挖隧道基坑施工对在建门诊大楼的影响。结果表明:在建门诊大楼基础变形在可控范围内;采用部分挖除基坑间岩土体、部分围护基坑的方法进行近接在建建筑物基坑施工是可行的。
重慶市東水門長江大橋與韆廝門嘉陵江大橋渝中連接隧道近接重慶市第一人民醫院在建門診大樓,其採用明挖法施工,基坑與在建門診大樓最近距離約0.6 m。針對該隧道工程,提齣基坑間近距離近接部分採用巖土體全部開挖、其餘部分採用懸臂樁闆牆進行基坑圍護的工程方案,併對上述2箇區域2種方案的基坑施工分彆採用三維與二維有限元進行數值模擬,以評估明挖隧道基坑施工對在建門診大樓的影響。結果錶明:在建門診大樓基礎變形在可控範圍內;採用部分挖除基坑間巖土體、部分圍護基坑的方法進行近接在建建築物基坑施工是可行的。
중경시동수문장강대교여천시문가릉강대교투중련접수도근접중경시제일인민의원재건문진대루,기채용명알법시공,기갱여재건문진대루최근거리약0.6 m。침대해수도공정,제출기갱간근거리근접부분채용암토체전부개알、기여부분채용현비장판장진행기갱위호적공정방안,병대상술2개구역2충방안적기갱시공분별채용삼유여이유유한원진행수치모의,이평고명알수도기갱시공대재건문진대루적영향。결과표명:재건문진대루기출변형재가공범위내;채용부분알제기갱간암토체、부분위호기갱적방법진행근접재건건축물기갱시공시가행적。
Yuzhong tunnel connecting Chongqing Dongshuimen Yangtze River Bridge and Qiansimen Jialing River Bridge is adjacent to out-patient building of Chongqing First People ’ s Hospital under construction, the tunnel is constructed in open excavated method and foundation pits are approximate 0. 6m at the nearest distance from the out-patient building under construction. Aiming at this tunnel project, this paper proposes an engineering scheme in which the rock-soil bodies in adjacent parts at near distance between foundation pits are all excavated by means of and for the other parts cantilever pile panel walls are employed to enclose foundation pits, and carries out numerical simulation for construction of foundation pits in above two areas in two schemes by means of 3 D and 2 D finite elements to evaluate the influences of foundation pits of open excavated tunnels on the out-patient building under construction. The results show that deformation of foundations of the out-patient building under construction is within the controllable range;the method of partially excavating rock-soil bodies between foundation pits and partially enclosing foundation pits to construct foundation pits adjacent to the buildings under construction is feasible.