水利与建筑工程学报
水利與建築工程學報
수리여건축공정학보
TECHNIQUE OF SEEPAGE CONTROL
2014年
6期
218-222
,共5页
左溪水电站%卵石夹层%进水口%放空设施
左溪水電站%卵石夾層%進水口%放空設施
좌계수전참%란석협층%진수구%방공설시
Zuoxi Hydropower Station%cobble layer%water inlet%escape facilities
针对左溪水电站施工过程中存在第5坝段卵石夹层及断层、进水口高程选取过低、无放空设施等问题,结合工程地质条件,采取帷幕灌浆加固、抬高进水口高程、利用导流洞及施工交通运输洞增设排沙放空设施等处理措施,确保工程安全可靠、节能经济建设。
針對左溪水電站施工過程中存在第5壩段卵石夾層及斷層、進水口高程選取過低、無放空設施等問題,結閤工程地質條件,採取帷幕灌漿加固、抬高進水口高程、利用導流洞及施工交通運輸洞增設排沙放空設施等處理措施,確保工程安全可靠、節能經濟建設。
침대좌계수전참시공과정중존재제5패단란석협층급단층、진수구고정선취과저、무방공설시등문제,결합공정지질조건,채취유막관장가고、태고진수구고정、이용도류동급시공교통운수동증설배사방공설시등처리조시,학보공정안전가고、절능경제건설。
The engineering and geological problems of the cobble layer and fault under the fifth dam block ,the inappro-priately low elevation of the water inlet ,and the lack of reservoir escape facilities were found during the construction of Zuoxi Hydropower Station .Specific measures such as curtain grouting consolidation ,increasing the elevation of water in-let ,and the addition of diversion tunnels ,transportation tunnels and sediment ejection facilities were adopted respective-ly .The result indicates that by adopting these measures the safe construction of the engineering project is ensured ,as well as energy conservation and economic construction .