为了获得隧道围岩在爆破荷载作用下的振动效应,运用有限元软件 ADINA 建立隧道计算模型,通过加载简化的三角形等效爆破荷载,模拟了青山隧道Ⅲ类围岩段在单循环进尺为2 m 、2.5 m 和3 m 三种情况下的爆破振动效应,得到了隧道拱顶、拱脚和边墙部位围岩的振动衰减规律。计算结果表明:围岩质点的峰值振速随着与开挖轮廓面距离的增大先急剧衰减后平缓衰减,开挖进尺越大,围岩受到的扰动越大。最后通过满足规范的安全质点振动速度来确定三种开挖进尺条件下的最大段药量大小,为类似隧道钻爆设计的合理性提供参考。
為瞭穫得隧道圍巖在爆破荷載作用下的振動效應,運用有限元軟件 ADINA 建立隧道計算模型,通過加載簡化的三角形等效爆破荷載,模擬瞭青山隧道Ⅲ類圍巖段在單循環進呎為2 m 、2.5 m 和3 m 三種情況下的爆破振動效應,得到瞭隧道拱頂、拱腳和邊牆部位圍巖的振動衰減規律。計算結果錶明:圍巖質點的峰值振速隨著與開挖輪廓麵距離的增大先急劇衰減後平緩衰減,開挖進呎越大,圍巖受到的擾動越大。最後通過滿足規範的安全質點振動速度來確定三種開挖進呎條件下的最大段藥量大小,為類似隧道鑽爆設計的閤理性提供參攷。
위료획득수도위암재폭파하재작용하적진동효응,운용유한원연건 ADINA 건립수도계산모형,통과가재간화적삼각형등효폭파하재,모의료청산수도Ⅲ류위암단재단순배진척위2 m 、2.5 m 화3 m 삼충정황하적폭파진동효응,득도료수도공정、공각화변장부위위암적진동쇠감규률。계산결과표명:위암질점적봉치진속수착여개알륜곽면거리적증대선급극쇠감후평완쇠감,개알진척월대,위암수도적우동월대。최후통과만족규범적안전질점진동속도래학정삼충개알진척조건하적최대단약량대소,위유사수도찬폭설계적합이성제공삼고。
In order to obtain vibration effect of tunnel surrounding rocks under blasting load ,the tunnel calculation model was established by using the finite element software ADINA .Under simplified triangle equivalent blast loading ,the blast-ing vibration effect of class Ⅲ surrounding rock section of Qingshan tunnel with the single footage driving cycle being 2 m ,2 .5 m and 3 m was simulated .And then the vibration attenuation law for adjacent rocks at the arch vault ,spring and side walls of the tunnel under blasting load action was obtained .As shown by the calculation results ,the peak particle velocity showed abrupt attenuation first and then flat attenuation with the increase of excavation profile distance .The larg-er the footage ,the more vibrations the rock was subject to .Lastly ,safety particle vibration velocity in compliance with specifications was used to determine the maximum charge under these three excavation footage conditions .This study will provide reference to the rationality of blasting and drilling design of similar tunnels .