达岱河水电站%主副坝%联合度汛
達岱河水電站%主副壩%聯閤度汛
체대하수전참%주부패%연합도신
Tatay hydropower station%main and auxiliary dam%flood passing scheme
∶达岱河水电站工程在施工过程中,通过研究分析工程地形地貌、地质条件、水文条件、以及施工进度计划,充分利用联通明渠,调整了主副坝度汛方案,减少了工程投资,降低了施工强度,确保了工程建设的推进。
∶達岱河水電站工程在施工過程中,通過研究分析工程地形地貌、地質條件、水文條件、以及施工進度計劃,充分利用聯通明渠,調整瞭主副壩度汛方案,減少瞭工程投資,降低瞭施工彊度,確保瞭工程建設的推進。
∶체대하수전참공정재시공과정중,통과연구분석공정지형지모、지질조건、수문조건、이급시공진도계화,충분이용련통명거,조정료주부패도신방안,감소료공정투자,강저료시공강도,학보료공정건설적추진。
During the construction of Tatay hydropower station, the project investment and the work intensity are greatly reduced through studying project topography, geological and hydrological conditions and construction schedule and adjusting flood passing scheme by making full use of open channel, which ensures the smooth progress of the pro-ject.