该文主要针对极不规则采煤工作面在材运两巷与切眼非垂直布置给综机设备安装带来的问题进行举例说明和极不规则工作面布置效益分析,并重点介绍所采取的方案,为类似工作面综机设备的安装提供参考。
該文主要針對極不規則採煤工作麵在材運兩巷與切眼非垂直佈置給綜機設備安裝帶來的問題進行舉例說明和極不規則工作麵佈置效益分析,併重點介紹所採取的方案,為類似工作麵綜機設備的安裝提供參攷。
해문주요침대겁불규칙채매공작면재재운량항여절안비수직포치급종궤설비안장대래적문제진행거례설명화겁불규칙공작면포치효익분석,병중점개소소채취적방안,위유사공작면종궤설비적안장제공삼고。
This paper mainly focuses on the fully mechanized face equipment installation problems resulted by the layout of the two roadways are not vertical to the open-off cut in irregular working face, illustrated and analyzed the working face layout efifciency, and focuses on the acting scheme, to provide a reference for the similar working face of fully mechanized face equipment installation.