为了确定受黄安断面同杆N-2故障热稳限制的甘宁断面潮流外送能力,分析了宁夏电网各电源、负荷节点对黄安断面的灵敏度系数,建立了受黄安断面热稳限制和电源装机、负荷容量大小及同时率约束的甘宁断面外送模型,基于MATLAB的线性规划函数编写程序,计算了黄安断面极限功率下甘宁断面外送功率的极值。结果表明:在当前电网结构和负荷水平下,甘宁断面外送能力最大值大于甘宁断面热稳极限,最小值小于热稳极限的一半,且外送能力随中卫地区负荷增长以3倍速度下降。电力系统分析综合程序(PSASP)数值仿真计算验证了上述结论的正确性。
為瞭確定受黃安斷麵同桿N-2故障熱穩限製的甘寧斷麵潮流外送能力,分析瞭寧夏電網各電源、負荷節點對黃安斷麵的靈敏度繫數,建立瞭受黃安斷麵熱穩限製和電源裝機、負荷容量大小及同時率約束的甘寧斷麵外送模型,基于MATLAB的線性規劃函數編寫程序,計算瞭黃安斷麵極限功率下甘寧斷麵外送功率的極值。結果錶明:在噹前電網結構和負荷水平下,甘寧斷麵外送能力最大值大于甘寧斷麵熱穩極限,最小值小于熱穩極限的一半,且外送能力隨中衛地區負荷增長以3倍速度下降。電力繫統分析綜閤程序(PSASP)數值倣真計算驗證瞭上述結論的正確性。
위료학정수황안단면동간N-2고장열은한제적감저단면조류외송능력,분석료저하전망각전원、부하절점대황안단면적령민도계수,건립료수황안단면열은한제화전원장궤、부하용량대소급동시솔약속적감저단면외송모형,기우MATLAB적선성규화함수편사정서,계산료황안단면겁한공솔하감저단면외송공솔적겁치。결과표명:재당전전망결구화부하수평하,감저단면외송능력최대치대우감저단면열은겁한,최소치소우열은겁한적일반,차외송능력수중위지구부하증장이3배속도하강。전력계통분석종합정서(PSASP)수치방진계산험증료상술결론적정학성。
In order to ascertain the transmission capability of power tidal current in Gansu-Ningxia section considering the thermal stability limit under N-2 fault on the same transmission tower of Huanghe-Ningan section,the sensitivity coefficient of electrical sources and load nodes of Ningxia power grid for Huanghe-Ningan section are analyzed,the Gansu-Ningxia section delivery model is established based on constraints of the Huanghe-Ningan section heat stability limit,the power plant installation and load capacity and simultaneity factor. Based on linear programming function of MATLAB,the transmission power extremum of Gansu-Ningxia section is calculated under the ultimate power of Huanghe -Ningan section. The result shows that the maximum value of transmission capability of Gansu-Ningxia section is greater than the Gansu Ningxia section heat stability limit,and the minimum value is less than half of the thermal stability limit,and along with the load growth of the Zhongwei area,the power transmission capability fall at a speed of 3 times. The correctness of the above conclusion is verified by the numerical simulation calculation based on power system analysis synthetic program(PSASP).