ADAMA%风机%吊装%成本控制
ADAMA%風機%弔裝%成本控製
ADAMA%풍궤%조장%성본공제
Adama%wind turbine%installation%cost control
总结了影响埃塞俄比亚ADAMA风机吊装项目成本的主要因素,如进度、机械租赁费、材料费、二次搬运费等,并提出了相应的控制成本措施,实践中有效控制了工程成本,取得良好效果,为更好地实施国际风电项目积累了经验。
總結瞭影響埃塞俄比亞ADAMA風機弔裝項目成本的主要因素,如進度、機械租賃費、材料費、二次搬運費等,併提齣瞭相應的控製成本措施,實踐中有效控製瞭工程成本,取得良好效果,為更好地實施國際風電項目積纍瞭經驗。
총결료영향애새아비아ADAMA풍궤조장항목성본적주요인소,여진도、궤계조임비、재료비、이차반운비등,병제출료상응적공제성본조시,실천중유효공제료공정성본,취득량호효과,위경호지실시국제풍전항목적루료경험。
The main factors impacting the cost control of WTG installation of Adama Wind Farm, Ethiopia, are summarized such as pro-gress, machine lease charges, material cost, re-transport costs, etc as well as the corresponding measures for the cost control are raised. In the practice, the project cost is effectively controlled and the excellent results are achieved.This accumulates the engineering experi-ence on the implementation of wind farm development .